12 Pioneer Dr TGC5-BLK14-Lot60

Located in the Timberon Gulf Course Subdivision Unit 5 Block 14 Lot 60

Section: TGC5-BLK14-Lot60
Address: 12 Pioneer Dr, Timberon, NM 88350
Size: 0.508 acre
Description: Couple blocks from golf course, between Rio Pinar & Winter
Est. Taxes: Similar lots average about $30-$50 a year
Price: $20,000
Terms: Cash: 20% cash discount = $16,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

59 Winter Lane TGC5-BLK14-Lot22

Located in the Timberon Gulf Course Subdivision Unit 5 Block 14 Lot 22

Section: TGC5-BLK14-Lot22
Address: 59 Winter Lane, Timberon, NM 88350
Size: 0.502 acre
Description: 1 block from golf course, big level lot, electric 2 poles away
Est. Taxes: Similar lots average about $30-$50 a year
Price: $20,000
Terms: Cash: 20% cash discount = $16,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

7 Winter Court TGC5-BLK14-Lot9

Located in the Timberon Gulf Course Subdivision Unit 5 Block 14 Lot 9

Section: TGC5-BLK14-Lot9
Address: 7 Winter Court, Timberon, NM 88350
Size: 0.506 acre
Description: One block from golf course
Est. Taxes: Similar lots average about $20-$30 a year
Price: $20,000
Terms: Cash: 20% cash discount = $16,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

107 Rio Pinar Dr TGC5-BLK9-Lot23

Located in the Timberon Gulf Course Subdivision Unit 5 Block 9 Lot 23

Section: TGC5-BLK9-Lot23
Address: 107 Rio Pinar Dr, Timberon, NM 88350
Size: 0.502 acre
Description: On the 15th T
Est. Taxes: Similar lots average about $20-$30 a year
Price: $22,500
Terms: Cash: 20% cash discount = $18,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

259 Eldorado Dr TGC4-BLK9-Lot11

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 11

Section: TGC4-BLK9-Lot11
Address: 259 Eldorado Dr, Timberon, NM 88350
Size: 0.541 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

 

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

4 London Hunt Dr or 263 Eldorado Dr TGC4-BLK9-Lot10

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 10

Section: TGC4-BLK9-Lot10
Address: 4 London Hunt Dr or 263 Eldorado Dr, Timberon, NM 88350
Size: 0.533 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

30 London Hunt Dr TGC4-BLK9-Lot9

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 9

Section: TGC4-BLK9-Lot9
Address: 30 London Hunt Dr, Timberon, NM 88350
Size: 0.477 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

34 London Hunt Dr TGC4-BLK9-Lot8

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 8

Section: TGC4-BLK9-Lot8
Address: 34 London Hunt Dr, Timberon, NM 88350
Size: 0.535 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

38 London Hunt Dr TGC4-BLK9-Lot7

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 7

Section: TGC4-BLK9-Lot7
Address: 38 London Hunt Dr, Timberon, NM 88350
Size: 0.504 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

42 London Hunt Dr TGC4-BLK9-Lot6

Located in the Timberon Gulf Course Subdivision Unit 4 Block 9 Lot 6

Section: TGC4-BLK9-Lot6
Address: 42 London Hunt Dr, Timberon, NM 88350
Size: 0.504 acre
Description: On the future 14th & 15th Green.
Est. Taxes: Similar lots average about $20 a year
Price: $18,500
Sale Price: $12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html