26 Lakewood Dr TGC2-Blk6-Lot62

Located in the Timberon Gulf Course Subdivision Unit 2 Block 6 Lot 62

Pictures of property.

Section: TGC2-Blk6-Lot62
Address: 26 Lakewood Dr, Timberon, NM 88350
Size: 0.607 acre
Description: 6th fairway
Est. Yearly Taxes: Similar lots average about $20 a year
Price: $20,000
Sale Price: $15.000
Terms: Cash: 20% cash discount = $12,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

30 Lakewood Dr TGC2-Blk6-Lot61

Located in the Timberon Gulf Course Subdivision Unit 2 Block 6 Lot 61

Pictures of property.

Section: TGC2-Blk6-Lot61
Address: 30 Lakewood Dr, Timberon, NM 88350
Size: 0.607 acre
Description: 6th fairway
Est. Taxes: Similar lots average about $20 a year
Price: $20,000
Sale Price: $15.000
Terms: Cash: 20% cash discount = $12,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

16 Lakewood Ct TGC2-Blk6-Lot52

Located in the Timberon Gulf Course Subdivision Unit 2 Block 6 Lot 52

Pictures of area near property.

 

Section: TGC2-Blk6-Lot52
Address: 16 Lakewood Court, Timberon, NM 88350
Size: 0.546 acre
Description: on 6th T of golf course
Est. Taxes: Similar lots average about $20 a year
Price: $20,000
Sale Price: $15.000
Terms: Cash: 20% cash discount = $12,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

1734 Sacramento TGC1-Blk5-Lot12

Located in the Timberon Gulf Course Subdivision Unit 1 Block 5 Lot 12

Pictures of actual property.

Section: TGC1-Blk5-Lot12
Address: 1734 Sacramento Dr, Timberon, NM 88350
Size: 0.571 acre
Description: On paved road, near downtown, Lodge, Pool, Airport & golf course
Est.  Taxes: Est. yearly tax around $50 year
Price: $ 18,500
Sale Price: $ 12,500
Terms: Cash: 20% cash discount = $10,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

109 Pleasant Valley Dr TGC1-Blk3-Lot17

Located in the Timberon Gulf Course Subdivision Unit 1 Block 3 Lot 17

Pictures of actual property.

Section: TGC1-Blk3-Lot17
Address: 109 Pleasant Valley Dr, Timberon, NM 88350
Size: 0.517 acre
Description: 1 block from Club house
Est. Taxes: Similar properties average around $50.00 year
Price: $27,500
Terms: Cash: 20% cash discount = $22,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

11 Eldorado TGC1-Blk3-Lot13

Located in the Timberon Gulf Course Subdivision Unit 1 Block 3 Lot 13

Pictures of actual property.

Section: TGC1-Blk3-Lot13
Address: 11 Eldorado Dr., Timberon, NM 88350
Size: 0.508 acre
Description: Great view, near clubhouse and 9th hole, 1 lot off the golf course, corner Eldorado and Pleasant Valley
Est. Yearly Taxes: Similar properties average around $50.00 year
Price: $27,500
Terms: Cash: 20% cash discount = $22,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

7 Eldorado Dr TGC1-Blk3-Lot12

Located in the Timberon Gulf Course Subdivision Unit 1 Block 3 Lot 12

Pictures of actual property.

Section: TGC1-Blk3-Lot12
Address: 7 Eldorado Dr., Timberon, NM 88350
Size: 0.510 acre
Description: Great view, near clubhouse and 9th hole, 1 lot off the golf course, corner Eldorado and Pleasant Valley
Est. Taxes: Similar properties average around $50.00 year
Price: $27,500
Terms: Cash: 20% cash discount = $22,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html

 

16 White Marsh Valley Dr TGC1-BLK2-Lot6

Located in the Timberon Gulf Course Subdivision Unit 1 Block 2 Lot 6

This slideshow requires JavaScript.

Pictures of actual property.

Section:  TGC1-BLK2-Lot6
Address: 16 White Marsh Valley Dr, Timberon, NM 88350
Size: 0.500 acre
Description: Near Club House, Quail Hollow @ White Marsh Valley Dr., great rental home location, close to golf course and restaurant/bar
Est. Taxes: Similar lots average about $50 a year
Price: $27,500
Terms: Cash: 20% cash discount = $22,000

Down payment: $500

Document Fees: $500

Select Term: Choose your length of payment at time of purchase, 5-30 years. 10% interest, no penalty for early payoff. 1st payment due 30-60 days after closing, depending on payment selection date. Choose payment date, 1st-29th of the month.

Notes: Residential Only, No Farm Animals, All utilities accessible to lot, no time limit to build.

Restrictive Covenant 1

Restrictive Covenant 2

Please note, The Architectural Control Committee no longer exists.

The covenants pertaining to real estate in Otero County can be found at the Otero County Assessors website.

Otero County NM website
https://www.co.otero.nm.us/

Otero County NM Assessor
https://www.co.otero.nm.us/213/Assessor

Otero County Subdivision Plat Maps and Surveys
https://www.co.otero.nm.us/222/Subdivision-Plat-Maps-Surveys

Restrictive Covenants
https://www.co.otero.nm.us/DocumentCenter/Index/46

For more information about this lot please use the contact form below or use the contact info on our Contact page.

Timberon Water & Sanitation Dept. (575) 987-2250
http://www.timberonwater.com/water-rates-and-charges/
Standby Fee: $61.15 a year per lot
Initial Water Meter Install: $675
Average Basic Monthly Water Bill (including Trash Service): $57.75
Facilities & Services Fee: $30 a year per lot

Electric

The Otero County Electric Company link for information about getting power to your lot is at:

www.ocec-inc.com/content/new-construction

Septic (New Mexico State Liquid Waste Regulations)
https://www.env.nm.gov/liquid_waste/laws-and-regulations/

Septic for small lots: These options apply to lots that are less than ¾ acre:

ATM Advanced Treatment Unit. more expensive // are Small water treatment plants require maintenance & sampling

SPLIT FLOW SYSTEM – 2 plumbing systems gray water into regular septic black water into holding tank (1000 gal typical)

ET BED Septic tank w/ sand & gravel bed 120 X 120

RV must be into a tank

Contact for this area is Michael Montoya NMENV (575) 288-2050 or (575) 649-4107.

Another resource is the New Mexico Environment Department website for the most current information on residential and commercial requirements for septic systems.
https://www.env.nm.gov/fod/LiquidWaste/guidance.html